Operation Equinox was conducted with the primary objective of providing security and protection to the High-Value Target (HVT) at an undisclosed area for 36 hours. The operation involved the deployment of personnel from WCSC (Worst Case Scenario Contracting). Utilizing civilian clothing and low-profile kits, the teams operated discreetly to ensure the safety of the HVT and visiting VIPs.

Preparation and Setup:

Upon arrival at the AO, a variety of vehicles were made available, including 5 Side by Sides, 1 Argo, and 1 Humvee. Engineers promptly commenced repairs and preparation of the vehicles for operational use. By 2000 hours perimeter security and a designated security route were established around the HVT cabin situated on the south side of a small lake. A large thermal detection network was deployed to enhance situational awareness and threat detection capabilities.

Security Meeting:

A comprehensive security meeting was conducted inside the HVT cabin, with all personnel briefed on communication SOP by on the on duty RTO. Initial thermal network scans revealed no immediate threats, allowing for continued strategic planning and coordination among the teams.

Day Operations:

Morning security shifts commenced with a fire pit established for warmth to combat temperatures dropping below -15 degrees Celsius. Personnel departed to retrieve the HVT from a designated meeting location, while heat signatures across the lake indicated potential human activity.

Upon returning with HVT, security measures were reinforced, and visiting VIPs underwent thorough security screenings. Despite heightened security, the night remained uneventful, with temperatures plummeting below a sustained -20 degrees celsius.

At 1600 hours, the HVT expressed interest in exploring the AO. After ensuring the route’s security, personnel accompanied the HVT on an extended UTV ride around the AO.

At 1930 hours, personnel were dispatched to pickup an urgent package for the HVT out of AO. With no imminent detected danger operational readiness was maintained.

VIP Arrival and Departure:

At 1000 hours, preparations were made for the HVT’s departure, necessitating thorough route reconnaissance and convoy arrangements.

A departure convoy led by Humvee, facilitated the safe extraction of the HVT from the AO without incident. Showcasing the effectiveness of the team’s coordination and readiness.

Conclusion:

Operation Equinox exemplified the professionalism and dedication of all personnel involved in safeguarding the HVT and maintaining operational security throughout the mission.

Lessons Learned:

  • Clear communication and coordination among team members are paramount to mitigating misunderstandings and responding promptly to emerging threats.
  • Maintaining operational readiness and adaptability in adverse environmental conditions is essential for mission success and personnel safety.
  • Continuous evaluation and refinement of security protocols and procedures are crucial for enhancing operational effectiveness and minimizing vulnerabilities.

Recommendations:

  • Continued training and simulation exercises to reinforce team cohesion and proficiency in handling diverse operational scenarios.
  • Regular equipment maintenance and readiness checks to ensure optimal performance and reliability in challenging environments.
  • Ongoing review and update of operational protocols based on lessons learned and evolving threat landscapes.

Prepared by: RAK-01